Tuesday, 22 April 2014

Electrical Fit, Outside Water Tap & Door Accessories

Hi All,

Time for another update, unfortunately we cannot come into the house since it is a public holiday, so just a small update from what we can see from the outside

Internal Door Fitting

Trilock Door Handle

Outside Tap and One of the Junction Box

Kitchen Still with Incorrect Tap and Light Fittings

Alfresco Lights and Ceiling Fan

Laundry with Light Switch

Sensor Lights for Sides of The House
Front Facade Lights (Sensor)

Not Sure What Is This??



Sunday, 13 April 2014

Plumbing, Heat / Cooling Vent & Security Alarm

Hi All

Another update on the progress of the house :)

Kitchen sink, bath, toilet and most of the tap-ware has been installed. Unfortunately they got our kitchen mixer wrong, so now I have a choice either to keep it or ask Carlisle to change it to the one that we order. Which one do you think is better looking?

Soft Close Toilet

Mixer Tap Installed

Bath Tub

Shower Mixer Installed

Kitchen Sink with Incorrect Tap

The Right Tap, Which one is better?

Some of the electrical fitting have also been done, 3 Point Security Alarm has also been installed

Connection in Lounge Area

One of The PIR
Heating and Cooling Vents have also been done around the house. Now considering that we can close the vent manually by twisting it make no sense to do zoning at all! Just need to close on the rooms that you are not using.

Heating Vent

Cooling Vent


Saturday, 5 April 2014

Tiling Completed (missing a piece)


Hi All,

It has been another week and surprisingly when I come to the house today there is someone working so we can come in and have a look :)

I now can see the painting done very closely. I already can see some minor imperfections that I will bring up on the next inspection.

I will have my first meeting with SS this Wednesday, really want to put a face on the name :) He has been very helpful along the way but have never manage to meet him so I requested it and he will walk me trough the current house.

Bathroom with one Missing Tiles not sure why?

Bathroom Shower Niche with Silver Trim

Ensuite
Ensuite Shower

Laundry Sink

Laundry Floor

Kitchen

Shimmer White Cesarestone  (sparkles when there is lights above it)

Garage from The Inside

Current Hallway




Sunday, 30 March 2014

Garage Door, Kitchen Benchtop, Internal Paintings, Part Tilings Update


Hi All,

Time for another update during the completion stage! Since the house is locked up, it is been hard to look into and last week we can't get into the house at all because it was being painted.

Next week the tiles will be finished and carpet / timber floor will start.

Then fitting the electrical :)

Now pictures time (all picture are taken from the outside)!

Current Front of The House with Garage Door Installed, Missing Render Colors!

Timber Post Painted with Corral. Can You Spot the Electrical Cable?

Looking at The Other Pier and Garage Door

Nearly Finished Kitchen with Cesarestone Bench-top Installed
Rumpus - All Painted (Grand Piano Quarter)
Room 2 
Laundry Room Tiles Partly Installed




Wednesday, 19 March 2014

Fixing Completed

Hi All,

It has been more than one week now and it is time for an update. Since the house is already locked up, it is harder for us to come and check the house. However we manage to get in the house because the SS left the door open for us for a short time.

It is true that this stage is when it is the slowest however, I still can see progress going on the house. All the door has been installed just need to add the handles, keys and painted. Skirting installation is now finished and they have started working on the shower base. Painting will start tomorrow.

Ensuite Shower

Front Door

Master Bed Double Door

Robe Sliding door

Ensuite Double Door

Skirting Installed

Pipes Installed

Eaves Plaster Installed

Two Facade Lights and Sensor Location

I'm sure it is a normal building practice but looking that we already paid 80% of the building and still don't have flooring done is a bit unfair..


Saturday, 8 March 2014

Lockup, Cornice, Kitchen Cupboard, Bathroom Cupboard, Laundry Cupboard

Hi All,

It has been another week passed and we just got our lockup invoice send to us last week. The house is now on fixing stage.

Cornices has been installed on the plaster and Laminex cupboard has been installed as well trough out the house. The Caesarestone for the kitchen will be added later on.

Master Ensuite

Bathroom

Laundry
Kitchen Cupboard 1 - Missing Caesarestone benchtop

Kitchen Overhead Cupboard - Missing Exhaust Fan, White Glass Door and Glass Splashback

Kitchen Cupboard 2 - Missing benchtop, Sink, Dishwasher & Microwave

Kitchen Overall & Overhead Fridge Cupboard

The front of the house is now pre-rendered with the render base, the color will be added later.

Front Facade Pre-Rendered

Garage

Back of the House

Next week they will finish fitting up the kitchen, start fixing the doors and start painting :)