Hi All,
Another week has passed and it has been a busy week for our building. Roof has now been completed with heating and cooling unit installed.
 |
| From Front with Sand Read for Brick Mortar Mix |
 |
| Back with Brick to be Installed & Evap Cooling Unit Installed |
Looking and how the roof tiles just been put on top of the frame with no barrier make me think about Sarking, but it is a bit too late now =p hoping that the tiles will not leak like colorbond roof.
 |
| Roof from Inside |
Windows has been installed on every rooms (We can now measure the windows correctly and look around for blinds), door frames & glass doors has been installed in all outdoor doors. Insulation Foil has been put in for most of the house.
 |
| Lounge |
 |
| Alfresco |
 |
| Dining |
 |
| Rumpus |
 |
| Master Bedroom |
 |
| Bedroom |
 |
| Living Room - with Plaster Board to be Installed Next Week |
Extra frame for double door in our lounge and sliding door for our en-suite has also been installed.
 |
| Lounge Entry with Double Sliding Door Frame |
 |
| Bathtub Frame |
Electrical rough in happen on Saturday this is when all the cabling works is done and plate is put in to support the light switches and connection (tv / data / phone) boards.
Tomorrow will be my second private inspection (Pre-plaster) I will be attending this one and will post the experience tomorrow night :)
Next week will be plaster, insulation batts and brick can't waitt!!! :)