Sunday, 22 December 2013

Current Building Progress (Christmas Break)

Carlisle Homes how has closed for Christmas and our progress is back on halt. The SS ask whether we still wanted to lay the foundation (rushing) before Christmas and let is stay under the hot of summer for 3 weeks or wait until Jan.

We choose to wait, we don't want to rush things and make sure everything goes accordingly. So Slab has now dated the 6th of Jan and frame the 13th. However site scrape has been done, portable toilet is in, sand barrier has been installed and that cage thingy to put rubbish is there. Also electrical meter is up and Carlisle sign (showing the SS details) has been put up in the site.

As you can see from the pictures below, all of our surrounding neighbors have gone way more than ours in regards to construction (remind you all settled in September 13). They are using Henley, Porter Davis and Simonds. 

The good thing about this is that we won't have a problem in the future that our neighbors start building (fencing to be put down for construction, dust, etc), all fencing costs will be divided equally (yay) and we think it will feel more like a community if our house is surrounded by other houses :).

To be honest I now found that Carlisle is a bit slow in regards to starting construction (showing that other builders can already gone to this stages below). I have finished all paperwork finance etc (other than final drawing) in the end of October. It took them a month to start the site scrape (early Dec). During this time, they are stating that they will be finishing the docs, ordering the material, estimating, and finishing final drawing. I'm hoping the wait is a guarantee of their work results. 

From Front

Look Messy from Back

One of Many Holes on the Ground, Probably to put the Ground Foundation?

Electrical / Meter Box



Friday, 20 December 2013

4th Contract Variation, Final House Plan & Final Electrical Plan

We have now receive and signed our final drawing which mean we won't be able to make anymore changes to the plan unless we want to pay ridiculous amount of penalty.

So these are our final house plans :)

Final House Plan

The plan is mostly standard, the changes that we made are change the robe doors to sliding doors, add sliding doors to ensuite, add double sliding door to lounge, add wall opening to rumpus (from meal) & add extra noggins to future tv location for possible wall hung TVs

For the electrical, we manage to add 4 more power points before they finish the drawing which mean avoiding variation fee :)

Final Electrical Plan

For electrical we do plan to change all the normal batten lights to a down lights after handover & add garden lights in the back and front of the house (with the Junction Box) however at the moment we think the current plan will be enough :)

Our CLE also inform the changes to basin and toilet, she said that these are new standard item which will replace the old ones. They look very similar to the old ones, I think it is just different brand

Old Toilet                           >>>>                   New Toilet  

Old Basin                        >>>>                       New Basin  

Other than that, all have been good and we cannot wait till the house finished!